10 July 2014

Capacity loss (MW) from APGENCO stations in Andhra Pradesh


Capacity loss (MW) from APGENCO stations in Andhra Pradesh

As per G.O Ms. No 20 of 2014
As per Geographical location
Impact
Existing
APGENCO- Thermal
2348
2810
-462
APGENCO- Hydel
1760
1670
90
Total (A)
4108
4480
-372
Under Construction
APGENCO- Thermal
1291
2200
-909
APGENCO- Hydel
189
50
139
Total (B)
1480
2250
-770
Total Capacity A+B
5588
6730
-1142

--- Extracts from White Paper on Power Sector in Andhra Pradesh

1 comment:

  1. 12वीं पास के लिए JNNSM में वैकेंसी, जल्द करें एप्ला3ई
    Readmore Todaynews18.com https://goo.gl/XbO3rc

    ReplyDelete